Product Details:
|
Product Name: | Bridge Erection | Keyword: | Bridge Erection Machinery |
---|---|---|---|
Type: | Launching Bridge Girder Erection Crane | Rated Loading Capacity:: | 80t |
Max. Lifting Height:: | Different | Span: | 40M |
Work Duty: | A5-A7 | Power Source:: | 3phase 380V,50Hz |
Usage: | Places The Prefabricated Beams On The Prefabricated Piers | Application: | Bridge And Highway Building |
High Light: | 80Ton Bridge Girder Launching Machine,A7 Bridge Girder Launching Machine,A5 A7 bridge girder machine |
80Ton 40m Span Bridge Erection Machinery For Bridge And Highway Building
The introduction of bridge erection machine:
The bridge erection machine is a device that places the prefabricated beams on the prefabricated piers. The bridge erection machine belongs to the category of cranes, because its main function is to lift the beam pieces, and then transport them to the position and then lower them. A bridge erecting machine is very different from a crane in the general sense. The required conditions are harsh, and there are beams running on the beam, or longitudinal movement. Bridge erection machine is divided into erecting highway bridges, conventional railway bridges, passenger railway bridges and so on.
Bridge Erecting Machine Parameters:
Product Model | SH50-160 | SH40-140 | SH40-120 | SH35-120 | SH30-80 |
Span (m) | 50 | 40 | 40 | 35 | 30 |
Lifting Capacity (T) | 160—260 | 140 | 120 | 120 | 80 |
Crane Moving Speed (m/min) | 2.7 | 2.7 | 2.7 | 2.7 | 2.7 |
Trolley Moving Speed (m/min) | 4.5 | 4.5 | 4.5 | 4.5 | 4.5 |
Trolley lifting Speed (m/min) | 0.8 | 0.8 | 0.8 | 0.8 | 0.8 |
girder-carrying speed of rear part (m/min) | 0-9 | 0-9 | 0-9 | 0-9 | 0-9 |
Skew Bridge Angle (°) | 45 | 45 | 45 | 45 | 45 |
Applicable curve radius (m) | R350 | R300 | R300 | R300 | R300 |
Power (KW) | 96 | 96 | 96 | 96 | 96 |
The composition of bridge erection machine:
The bridge erecting machine is mainly composed of the arm, the No. 1 hoisting trolley, the No. 2 hoisting trolley, the No. 1 column, the No. 2 column, the No. 3 column, the hydraulic system, the electrical system, the diesel generator set and the safety protection monitoring system.
The beam is transported by the beam transporter to the rear of the bridge erecting machine to feed the beam, the hoisting trolley lifts the girder to pull the beam, and the position of the box girder is fine-tuned in the air. It can erect 32m, 24m, 20m double-line whole-hole box girder, adapt to erect minimum curve radius R5500m, adapt to erect maximum longitudinal slope 20‰, rated lifting weight 900t.
Bridge Erecting Machine Photo:
Contact Person: Tina Tan
Tel: +8613875750450
Fax: 86-755-23343104